OUR WORKS
Exterior wall renovation
Prepared and rendered exterior walls prior to painting. ...
Complete bathroom installation
Bathroom installation. Ripped out and installed bath shower basin, toilet and electrics throughout. ...
Complete floor restoration
Insurance claim. Ripped out rotten floor joists and reinstated on new dwarf walls ...
House paint job
Stripped and repainted two paint coats to the sides of the house. Removed ...
Entrance construction
Built easy access and matched paint to the existing house colour. Handrail detailed ...
Complete kitchen design and restoration
Renewed all plumbing and electrics. Install new kitchen and workstation/breakfast bar and fixed ...
Kitchen design and installation
Kitchen design and Installation. Tiling, electric and plumbing too. ...
Complete refurbishment
Guted the entire building back to brickwork and injected the entire ground floor ...
Complete refurbishment.
4 weeks of complete re design and refurbishment. Previous to the restoration the ...
Home construction.
House Construction. Watertight Contract. 4 Months. Myself plus one laborer. ...
OUR WORKS